PROJECT TYPE
Acoustic solid and glazed partitions, bespoke oak veneer woodwork,ironmongery, suspended ceilings
INSTALLATION DATE & DURATION
February 2018
18 weeks
LOCATION
High Security Office, Central London
MAIN CONTRACTOR
Cupaz Ltd
PROJECT DESCRIPTION
Pirin Projects were contracted to complete the installation of acoustic insulation solid wall and glazed partitions, suspended ceilings and bespoke British oak veneer woodwork and doors at these high security offices in central London.
The first task was the installation of the solid partition walls and acoustic double-glazed frosted partitions to create office spaces and meeting rooms. These were then fitted with bespoke solid timber English oak veneer woodwork and doors with stainless steel ironmongery to create high specification finish in the individual office areas and meeting rooms.
Once the partition walls were installed 500mm x 500mm SAS System 130 suspended ceilings were installed on a 15mm Truelock grid system to the open plan office areas. The suspended ceilings allowed us to conceal wiring and pipework for the services into the spaces and create a neat and polished finish.
Looking for help with a similar project?
At Pirin Projects we have a wealth of expertise and experience in installing all kinds of interior walls and ceilings. If you have a similar project, we would love to hear from you and welcome the opportunity to provide an obligation free quotation.
For more information about our range of products and services, or to arrange an appointment for a site visit and quotation, please feel free to drop us a line.