PROJECT TYPE
Create a Showroom. Metal stud and plasterboard partition walls, suspended ceiling.
INSTALLATION DATE & DURATION
5 weeks
LOCATION
Whittle Way, Stevenage, Hertfordshire
MAIN CONTRACTOR
Cupaz Ltd
PROJECT DESCRIPTION
Pirin Projects were contracted to build a new product show room.
The walls of the showroom were constructed as solid 5m high braced partition walls with a 1-hour fire rating were used. Once the stud walls were secure in place they were fitted with skirting boards and oak veneer doors and frames.
A tape and joint application was applied to create a smooth finish on the plasterboard surface. The walls were then decorated in white matt emulsion paint.
Once the walls were complete the area was then fitted with an Armstrong suspended ceiling. We used 600mm x 600mm Dune tiles and 100mm insulation above the ceiling to gain from the benefit of thermal insulation.
A solid plasterboard partition wall was then built to separate two office areas with a single glazed glass partition wall with integral glazed doors to create the frontage of the light but private work areas giving them a view of the adjoining open plan office area beyond.
Looking for help with a similar project?
At Pirin Projects we have a wealth of expertise and experience in installing all kinds of interior walls and ceilings. If you have a similar project, we would love to hear from you and welcome the opportunity to provide an obligation free quotation.
For more information about our range of products and services, or to arrange an appointment for a site visit and quotation, please feel free to drop us a line.