PROJECT TYPE
Create an office. Plasterboard walls and suspended ceilings
INSTALLATION DATE & DURATION
24 weeks
LOCATION
Hayes
MAIN CONTRACTOR
Penwright Supply Ltd
PROJECT DESCRIPTION
Pirin Projects were contracted to create an office space at this warehouse in Hayes.
First of all solid plasterboard partition walls with windows were installed, complete with all of the joinery were installed to form office and welfare areas within a commercial warehouse. The walls were then given a painted finish.
The walls completed, the suspended ceilings were then installed into the newly created spaces to provide a space to hide the wiring and pipework for the services including air conditioning and lighting. Sektor Sahara 600mm x 600mm tiles ceiling tiles were chosen for the ceilings to provide insulation in the form of sound absorption and as a thermal lining to retain heat and allow for ventilation.
As you can see from the photos, the finished office space within the warehouse is a light and airy with lighting and air conditioning incorporated into the suspended ceiling to create clean lines.
Looking for help with a similar project?
At Pirin Projects we have a wealth of expertise and experience in installing all kinds of interior walls and ceilings. If you have a similar project, we would love to hear from you and welcome the opportunity to provide an obligation free quotation.
For more information about our range of products and services, or to arrange an appointment for a site visit and quotation, please feel free to drop us a line.